RIO GRANDE SOUTHERN #20




The RGS #20 project is now under way with the construction of the frame assembly. Section 1 thru 5 has been delivered for the locomotive and sections 1 thru 3 for the tender. See the section descriptions below for detailed information.

A second batch of locomotives is going to be started early in 2004.  Contact  us now for additional information or to sign up for one of the locomotives in the second batch.








Specifications and calculations for the #20

Select one of the following for pricing: ready to run locomotive, machined Parts, unmachined parts

LOCOMOTIVE

Section 1 Frame Assembly

Section 2 Drivers and Axles

Section 3 Front Truck

Section 4 Spring Assembly

Section 5 Main and Side Rods

Section 6 Smoke Box

Cab Wood Cab for the 20

Boiler Boiler for the 20

TENDER

Section 1 Tender Trucks

Section 2 Tender Frame

Section 3 Tender Tank for the 20



Check the Photo Archive for pictures of progress.